Maquette de NDT managerFlèche vers le bas
Scroll down
SREM & Atlas NDT

Redesign an infrastructure analysis platform

Sector
Industrie
Products
Web app
Mobile app
Date
2022/2023

About the project

The Non-Destructive Testing sector, which consists in verifying parts before using them in industry (aeronautics, nuclear, construction, etc.) has long remained without digitization. SREM and Atlas are coming together to carry out this project and change the face of the sector.

NDT manager is a platform that allows controllers to validate part and machine compliance. The objective is to support and launch the product on the market.

EXPERTISES

User Research

Product design

Product management

Front Development

Back Development

Maquette de NDT manager

The problems addressed

In the transition to the digitalization of non-destructive testing, several challenges must be met to ensure smooth and effective integration. Identifying and resolving the main obstacles encountered in the non-destructive testing process is critical to the success of NDT Manager.

01

The transition from paper to digital

The migration of non-destructive testing processes from paper-based methods to a digital platform represents a major challenge in terms of adoption and integration.

02

The use of a tablet in an all-terrain environment

The often hostile environment of industrial sites requires a robust and ergonomic solution for the use of tablets during field inspections.

03

The traceability of the results of the controls

Ensuring the complete traceability of control results is essential to meet industrial standards and regulations as well as the need to track the history of inspected parts.

04

Creating an MVP that's quick to test and iterate

Develop a minimum viable product (MVP) quickly in order to gather user feedback and iterate quickly to meet specific market needs.

Maquette de NDT manager
Maquette de NDT manager
Maquette de NDT manager
Maquette de NDT manager
Maquette de NDT manager

The challenges of the project

The success of the project depends on taking into account the specific challenges of the business and its operational context. To meet market and user expectations, it is crucial to understand and prioritize the main challenges to be overcome in the development of the NDT Manager solution.

01

Understanding the job and its challenges

A thorough understanding of non-destructive testing processes and their industrial implications is required to design a suitable solution.

02

Communicate between operator teams

Facilitating communication and collaboration between teams of operators in the field and their managers is crucial to ensure the effectiveness of operations.

03

Facilitate interactions with digital media

Offer a clear and intuitive interface to allow users to easily interact with the digital platform, reducing friction and increasing adoption.

04

Retrieving data easily and quickly

Establish effective mechanisms to collect, process, and return control data quickly and reliably to help make informed decisions.

Maquette de NDT manager
Maquette de NDT manager
Maquette de NDT manager
Maquette de NDT manager

The solutions provided

To meet the challenges identified, several solutions have been developed to ensure the successful development of the NDT Manager platform. The design and implementation of adapted solutions are crucial to effectively solve the problems encountered during the transition to the digitalization of non-destructive testing.

01

Development of a user-friendly interface

Design an intuitive and easy to use interface regardless of profiles and their digital appetite, in order to simplify the transition from paper-based processes to digital workflows, taking into account the specific needs of users.

02

Setting up a data management system

Develop a system for monitoring control results allowing complete traceability of the parts inspected and the verifications carried out, with secure storage and data access functionalities according to the user.

03

Adaptation of mobile technologies to field constraints

Customize the tablet solution to meet the specific requirements of off-road work environments, thus ensuring the reliability and performance of the devices regardless of the external environment.

04

Adopting an agile and collaborative approach for continuous iteration

Establish an iterative process to quickly develop and test an MVP, actively involving users to gather their feedback at each stage of development. This approach guarantees a direct response to market needs and requirements.

Maquette de NDT manager

Project methodology

Our methodology is based on a rigorous and user-centered approach. It includes extensive research into user needs, intuitive UX-UI design, rigorous user testing, and agile full-stack development to ensure a responsive and functional solution.

01

Search users

Conduct an in-depth analysis of the needs of end users as well as the specific challenges encountered in the non-destructive testing sector, in order to guide the development of the platform according to real market requirements.

02

UX-UI design

Design an intuitive and ergonomic user interface by integrating the results of user research, in order to offer an optimal user experience and to facilitate the adoption of the platform by operators in the field.

03

User tests

Submitting prototypes and development versions to rigorous testing with real users, thus collecting valuable feedback on the usability, functionality and relevance of the platform before its full deployment.

04

Full-stack development

Implement the necessary functionalities and infrastructures for the NDT Manager platform, using an agile and iterative approach to ensure the rapid delivery of functional versions while integrating user test feedback for continuous improvements.

Timeline du projet de NDT Manager

The skills of the teams

L'équipe derrière le projet NDT Manager possède un ensemble diversifié de compétences essentielles, alliant à la fois expertise en design et en développement. Ces compétences sont cruciales pour garantir la conception, le développement et le déploiement réussis de la plateforme.

User research

Research to understand the needs and behaviors of end users.

Product management

Definition of the strategic vision of the platform, prioritization of functionalities and coordination of team efforts.

UX UI design

Design of intuitive and ergonomic user interfaces for desktop and tablet.

User testing

Rigorous user tests to assess the functionality and relevance of the platform.

Technical framework

Understanding of the technical aspects of the project and definition of the software architecture.

Front development

Development of the user interface of the platform.

Back Development

Implementation of the platform's functionalities and business logics.

Data security

Protection of sensitive information collected and processed by NDT Manager.

Our technical stack for this project

The “NDT Manager” project that we have developed is an advanced solution for digitizing non-destructive testing (NDT) processes in the context of Industry 4.0. It includes a mobile application and a desktop backoffice, interconnected via an API. This solution replaces paper documents, ensuring efficient and secure management of CND data. Data historization is essential, offering complete traceability and compliance with industry standards, while optimizing the accessibility and accuracy of information.

Logo Express.js
express.js
Logo de Kotlin
Kotlin
Logo PostgreSQL
PostgreSQL
Logo Ovh Cloud
OCH Cloud
Logo vue.js
Vue.js
Schema technique de NDT Manager
Schéma de NDT Manager

From the paper factory to the dematerialized factory

In collaboration with Atlas NDT and SREM, we have developed an innovative vision for the future of their businesses. Thanks to this service, we significantly minimize losses and input errors. In addition, the traceability of activities ensures compliance with the rules, facilitating the success of the audits that punctuate the professional sector.

The results in a few figures

A live MVP in September 2023

Launch of a pilot with beta testers.

A V1 live in January 2024

A project ready to be marketed.

Client launch

Major groups have already initiated discussions for versions adapted to their environments.

5/5 étoiles de notation

“Thanks to the 40/60 agency initiative, we have been able to design a revolutionary tool that will propel CND into a new era.”

Stéphane from NDT Manager's profile photo
Stéphane Graveleau
Technical Director - SREM Technologies
NDT Manager logo